Quick Stats

2C Statistics for 2023 (as of September 30, 2023)

  • Repaved 148 lane miles
  • Replaced more than 210,820 linear feet, or 38 miles, of curb and gutter
  • Replaced 635,935 square feet of sidewalk
  • Installed 354 new pedestrian ramps
  • Retrofitted 875 existing pedestrian ramps

2C Cumulative Statistics (as of September 30, 2023)

  • Repaved 1,597 lane miles
  • Replaced 1,564,715 linear feet of curb and gutter
  • Replaced 3,616,838 square feet of sidewalk
  • Installed 1,809 new pedestrian ramps
  • Retrofitted 7,613 existing pedestrian ramps