2C Roadway Improvements

2C Road Improvements

It’s a question we get from time to time after it snows. It’s understandable when getting down your street is the toughest part of your drive on a... Read more
Residents along Pitkin Street worked with City staff to address localized flooding between Platte Ave and Boulder Street. Localized flooding near... Read more
To keep snow and ice control at a reasonable cost and to ensure crews can keep vital roads and emergency routes clear,  the City has to prioritize... Read more

Public Works

Department Contact

Contact

Phone: (719) 385-5918
Email Public Works


Address:

30 South Nevada Ave.
Colorado Springs, CO 80901

 2C 2018 roadwork statistics:

  • 222.5 lane miles of roadway paved
  • 130,773.40 linear feet of curb and gutter replaced
  • 266,479.23 square feet sidewalk replaced
  • 117 new pedestrian ramps installed
  • 834 existing pedestrian ramps retrofitted
  • More than 150,614.02 tons of asphalt placed

Public Works Cone Zones

There’s a great way to keep track of what’s happening on the roads that you travel on the most.  Avoid backups with our Cone Zones map, or by using the Waze app on your smartphone.