Information Open House
Join Public Works staff and the project team for a public open house on Tuesday, Sept. 17 from 5 p.m. to 7 p.m. at Skyview Middle School (6350 Windom Peak Blvd.). Stop by at your convenience to review project exhibits and ask questions. Meeting materials are available on this page for review under "Open House Exhibits."
About
Dublin Boulevard from Fieler Drive to Marksheffel Road will be improved from a two-lane road to two lanes in each direction with shoulders. A raised median will be constructed to match other sections of Dublin Boulevard. Additional improvements include a ten-foot multi-use path along both sides of the street, trail connections along Sand Creek, and a new traffic signal at Issaquah Drive. Drainage upgrades include storm sewer pipes, inlets, and water quality structures.
The project is currently in the design phase with construction expected to start in spring 2025.
Project Benefits
- Enhance pedestrian access with new multi-use paths, connections and crosswalks
- Improve mobility by adding an additional lane in each direction and turn lanes at select intersections
- Change access points and remove turning movement conflicts for drivers
- Optimize safety by installing a new traffic signal at Issaquah Drive
- Address groundwater infiltration near Peterson Road
Project Updates
Open House Exhibits
Click the links below for downloadable versions of the exhibit boards displayed at the Sept. 17 open house: